Monday, May 25, 2015

Rupert Garcia 2nd Piece


We are now starting on the second lobby piece by Rupert Garcia. We'll continue on the first one once we have our scaffolding installed. We have a slight issue with this wall though. We normally start on the bottom left but that happens to be above the fire control center and they work all the time so we have to think up a solution.

Luckily the mosaic has a straight line going up the left side, 6 feet in, enough space to be out of the doors way

Our guidelines are very important here since we are not starting along a straight wall like we normally do.

They're challenging chalk lines since we had to put the scissor lift as close to the wall as we could without blocking the door in order to get an accurate measurement six feet in.

We were able to make a back buttering table on the scissor lift.

Our first piece, the back buttering is for the lines of black smalti that goes through the ceramic pieces.







This piece has a large flower in it that is all glass smalti, surrounded by hand glazed ceramic tile with black smalti lines throughout.


End of day 10!